Type: On-grid

Date: 2021-12-03

System Capacity: 400kW

Inverters: XG100KTR/XG110KTR/BG60KTR

Quantity: 4 Sets

Location: Zhangjiagang, Jiangsu, China

The 400kW rooftop commercial PV station is equipped with INVT Solar three-phase on-grid inverters, including two XG100KTR, one XG110KTR and one BG60KTR. The plant was connected to the grid and put into operation on December 3, 2021, and is in stable operation.